Era Scaffold's C60/C48/C25 Shoring System is a heavy-duty falsework and access solution engineered to support structural loads across building, bridge, LRT and MRT construction projects. Manufactured for high load capacity and fast on-site assembly, it doubles as a shoring tower, external scaffolding platform, access stair tower, table form base and mobile tower. As a Klang, Selangor-based supplier, we serve construction projects across the Klang Valley and beyond.

Foundations

What Is a Shoring System

A shoring system is a temporary structural support used in construction to hold up formwork, slabs, beams, or excavation walls until permanent structural elements can bear their own load. In falsework applications, shoring towers support wet concrete floor slabs and beams during curing; in access applications, the same modular components convert into stair towers, mobile towers, and working platforms.

The C60/C48/C25 naming reflects three load classes of the same modular system — allowing one product family to scale from lighter access work up to heavy infrastructure loading.

Compare Load Classes

C60 vs C48 vs C25

FeatureC25C48C60
Load capacity per leg~2.5 tonnes [VERIFY]~4.8 tonnes [VERIFY]~6 tonnes [VERIFY]
Typical standard (vertical post) diameter[VERIFY][VERIFY][VERIFY]
Best suited forLight-to-medium access towers, mobile towers, smaller building worksMid-range formwork/falsework, general building constructionHeavy infrastructure — bridges, LRT/MRT structures, high-rise falsework
Relative assembly speedFastFastFast (heavier components)
Common applicationsAccess stair towers, painters'/light maintenance scaffoldingTable form, general building falseworkBridge shoring, rail infrastructure, high-load formwork support

Figures marked [VERIFY] are placeholders pending confirmation from engineering before publishing.

Why It Works

Key Benefits

Wide configuration range

Horizontal ledgers and brace sizes adapt to varied site geometries and load requirements.

High loading capacity

Supports heavy structural and infrastructure loads across all three system classes.

Durability

Built for repeated use across multiple projects with minimal wear.

Quick assembly and dismantling

Wedge-pin/cup-lock style connections reduce labour hours on site.

Interconvertible and compatible

Components convert between shoring tower, scaffolding, stair tower, table form and mobile tower configurations.

Cost efficiency

Fewer specialised parts needed across project types reduces equipment overhead.

Low labour cost

Simplified assembly reduces the crew size and time required.

Wide range of accessories

Base jacks, U-heads, braces, and platform components available to suit site-specific needs.

Engineering Data

Technical Specifications

SpecC25C48C60
Standard/jack tube length options[VERIFY][VERIFY][VERIFY]
Ledger sizes available[VERIFY][VERIFY][VERIFY]
Base plate / screw jack type[VERIFY][VERIFY][VERIFY]
Brace sizes[VERIFY][VERIFY][VERIFY]
Material & finishHot-dip galvanized steel [VERIFY]Hot-dip galvanized steel [VERIFY]Hot-dip galvanized steel [VERIFY]
Compliance standard[VERIFY — e.g. BS1139 Part 5][VERIFY][VERIFY — e.g. BS EN 12810-1/2]

Where It's Used

Applications

C60 shoring tower supporting slab formwork on building construction site

Building Construction

Used as falsework shoring to support concrete slabs and beams during casting and curing on residential, commercial and industrial building projects.

Heavy duty shoring system supporting bridge deck formwork

Bridge Construction

Provides high-capacity temporary support for bridge deck formwork and heavy structural loading during construction.

Shoring system used in LRT guideway construction Malaysia

LRT Construction

Deployed as falsework and access support for elevated rail guideway and station structure works.

C60 C48 shoring tower at MRT construction site

MRT Construction

Supports underground and elevated MRT structural elements requiring high load-bearing falsework.

Modular access stair tower built from shoring system components

Shoring Tower / Access Stair Tower

Reconfigures into freestanding access towers with integrated stair units for safe vertical access on site.

Mobile tower configuration of C25 shoring system

Mobile Tower

Fitted with castor wheels for relocatable working platforms across a site without full disassembly.

Site Process

Erection Procedure

Site preparation

Level and prepare the ground/base surface; position base plates or screw jacks at marked grid points.

Erect standards

Install vertical standards (posts) at each base point, connecting sections to reach the required height.

Fit ledgers and braces

Connect horizontal ledgers and diagonal braces to lock the frame and provide lateral stability.

Level and adjust

Use screw jacks to fine-tune height and level across the full tower or bay.

Install working platform

Fit access platforms, guardrails and toe boards as required for safe working access.

Inspect and load-test

Check all connections, pin locks and stability before applying structural load.

Our Difference

Why Choose Era Scaffold

Era Scaffold System Sdn Bhd is a one-stop scaffolding, falsework and formwork specialist based in Klang, Selangor, serving infrastructure works, building projects, warehousing and factory works, and niche industrial sectors including oil & gas, aircraft and shipyard works. We offer conscientiously customised solutions rather than one-size-fits-all equipment — if a standard product doesn't fit your project, we work with you to find one that does.

Questions

Frequently Asked Questions

Load capacity varies by class: C25 supports lighter to medium loads, while C60 is rated for the heaviest structural applications such as bridge and rail infrastructure. [VERIFY exact figures before publishing]

The three classes share the same modular system design but differ in load rating and typical application — C25 for lighter access and general building work, C48 for mid-range formwork and building falsework, and C60 for heavy infrastructure loading such as bridges and rail structures.

Yes — the same components can be reconfigured as a falsework shoring tower, external scaffolding, access stair tower, table form, or mobile tower.

[VERIFY — confirm with sales team, add answer]

Era Scaffold is based in Klang, Selangor and supplies shoring systems for construction projects across the Klang Valley and wider Malaysia. [VERIFY service area]

[VERIFY applicable standard, e.g. BS1139 Part 5 / BS EN 12810, before publishing]

Instant Procurement & Logistics

Need an Immediate Budget Estimate?

Connect directly with our lead technical directors for real-time stock availability, rental/purchase pricing structures, or urgent on-site requirements.

Technical Director — Ir. KB Lee+6012-2890 988
Commercial Director — Allen Lim+6016-3355 028

Enterprise RFP & Tender Submissions

Submitting an Active Project Tender?

Secure a comprehensive commercial and technical proposal. Upload your project's structural drawings or Bill of Quantities (BQ) for our engineering team to review.

Please enter your full name
Please enter a valid email address
Please enter a contact number
Attach drawings or BQ PDF, DWG, XLSX — up to 25 MB
Received. Our engineering team will review your submission and respond within one working day.