How our C60 system and in-house load calculations supported a heavy transfer structure without disrupting the construction sequence.
Transfer slabs concentrate enormous point loads through a small number of columns, and the temporary works supporting them have to be engineered, not improvised. Our team modelled the bay layout, lift heights, and re-shoring sequence before a single component reached site — keeping the critical path intact.